09January
Fort Knox Infantry Platoon Battle Course
![](https://www.jrc-inc.com/wp-content/uploads/2017/01/knox001_prev.jpg)
Location: Ft. Knox, KY
General Contractor: Barlovento
This job involved mass earthwork of over 100,000 cubic yards and the installation of access roads, storm drainage, and target site obstacles built of concrete block and timber logs.
09January
Gregory Levee Pump Station
![Gregory Levee Pump Station](https://www.jrc-inc.com/wp-content/uploads/2017/01/gfeat.jpg)
Location: Canton, Missouri
Foreman: Scott Robards
During the flood of 1998 this station was thirteen feet under water.
08December
Fort Knox Infantry Squad Battle Course
![](https://www.jrc-inc.com/wp-content/uploads/2016/12/post-img2.jpg)
Ft. Knox, KY
General Contractor: H.W. Pence
This job included mass earth work of over 90,000 cubic yards, Installation of Access Roads, Storm Drainage, and Target Site Obstacles built of Concrete Block and Timber Logs.